Ashrae 2010 download




















Watch to the video is here link and download the presentation in PDF here link.. This handbook discusses various systems and the equipment components or. Download our mobile app to search and read engineering technical references.. Health-related material with standards.. As of today we have 40, eBooks for you to download for free. No annoying ads, no download limits,. Free automatic document updates. Refrigeration Commissioning Guide Free Download.

This book was printed on acid-free paper. Get this from a library! I've just upload Ashrae Handbook Standards to 4shared. Each system must meet the manufactures sizing guidelines.

The pipes that hold the hot water need to be insulated and there are certain insulation requirements for each system type and piping material. There are many controls that hot water systems need and each control has a different requirement.

These include are temperature controls, temperature maintenance controls, outlet temperature controls, and circulation pump controls. There are also requirements for pool heaters, pool covers, and heat traps for heated pools. If new lights are installed or replaced in any building space, with a few exceptions, they must abide by the Lighting Power Density requirements.

Lighting also has many requirements to follow, which includes the prescriptive requirements to determine the quantity of lights for the building. There are also interior lighting controls that need to be installed for buildings larger than sqft. There are also many requirements on lighting that include exit signs and exterior lights. Energy savings compared to DOE issued a positive determination and notified states that they should adopt The scope was expanded to include defined industrial processes, which in the edition includes only economizers for data centers.

Changes to Building Envelope include skylights, solar reflectance, thermal emittance, air barriers, and solar orientation. Minimum efficiency requirements for many types of HVAC equipment were revised. Other revisions affect the maximum fan power limits, pump head calculation, chilled water pipe sizing, radiant panel insulation, single-zone VAV, and supply air temperature reset.

Energy recovery is required for many more HVAC systems. Several reheat exceptions were eliminated or modified. Restrictions were placed on overhead air heating. Economizer requirements were added for more climate zones and smaller systems. Class A is now required for all duct sealing. Lighting power densities LPD dropped slightly on average. Daylighting and associated lighting control requirements were added. Many lighting control requirements were added, including independent functional testing of lighting controls, occupancy and vacancy controls, exterior lighting controls, and whole-building shutoff.

Offices and computer classrooms now require 50 percent of V receptacles to be automatically switched. Requirements were added for service water booster pumps and elevators. Ashrae Performance path : A proposed building design is demonstrated through building performance simulation to use less energy than a baseline building built to ASHRAE This now has three paths. For code compliance there is Chapter 11, which compares an energy model for your building to an energy model for a barely compliant building with the same HVAC system and in the edition an Appendix G path was added that compares an energy model of your building against a baseline model based on the edition of Standard Other countries have different forms such as Ireland's building energy rating, or Hong Kong's Buildings Energy Efficiency Ordinance History and development [ edit ] Standard [ edit ] Development of Standard 90 began in the aftermath of the energy crisis of Standard Energy Standard for Buildings.

Except Low-Rise The climate zones are. Reference Manual document through the Standard



0コメント

  • 1000 / 1000